our proJects

Businesss Management Services

  • Provide lean management consulting to

    DOE HQ to identify areas of waste in the DOE EM procurement process and develop a procurement schedule to manage the entire inventory of procurement workload.  These efforts led to DOE Procurement being able to cut procurement time in half.

  • Performed retrospectives or lessons learned with DOE Portsmouth, DOE West Valley Demonstration Project (WVDP) and DOE East Tennessee Technology Park (ETTP) Source Evaluation Board (SEB) and Integrated Project Team (IPT) to obtain best practices with pre-award to post-award transition.

  • Identified areas of waste in the transition process (pre-award to post-award).  Defined and implemented an improved process from pre-award to post-award at DOE HQ.

 

 

 

 

Radiological Engineering / Health Physics

  • Support for Radiological Survey and Decontamination efforts for naval ship USS Essex docked at San Diego Naval Station in San Diego, CA.

  • Provide Radiological Control support to manage the Moab UMTRA Project radiological control program and maintain DOE Laboratory Accreditation Program for Radiobioassay and External Dosimetry.

  • Provide Radiological Control Technician and Quality Assurance support at the Los Alamos National Laboratory.

  • Health Physics Technician Support Services at the Y-12 National Security Complex in Oak Ridge, TN.

  • Radiological Engineering in support of the deactivation, demolition, and removal of the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory.

     

 

Environmental Services

  • Environmental Compliance/Waste Services to handle, perform inventories of, and characterize chemicals, laboratory equipment, furniture, and other miscellaneous materials and perform chemical and radiological characterizations of hazardous, mixed and radioactive wastes at the Oak Ridge National Laboratory.

  • Radiological Material License (RML) compliance audit; review and revise the Maxey Flats Project Radiological Lab Manual; validation of environmental radiological data; and provide radiation safety, RML, and Lab Manual training at the Commonwealth of Kentucky Maxey Flats Project.

  • Technical support for Rapid Remedial Action for naval ships at the SW Regional Maintenance Center in San Diego.

 

 

 

 

Staffing Services

  • Provide technical staff to support the Argonne National Laboratory Waste Management Operations Division in waste planning, radiological and chemical characterization of wastes, preparation of shipping paperwork and coordination off-site transportation of waste, development and review of supporting documentation and procedures.

  • Provide personnel as requested for staff augmentation at the Department of Energy (DOE) DUF6 Conversion Facilities in Paducah, KY.

  • Staff Augmentation contract with Babcock & Wilcox to provide personnel as requested for temporary or permanent positions nationwide.

  • Provide staffing for the GLE Commercial Facility licensing and design project.

  • Administrative, engineering, professional and technical staffing services at the Idaho National Laboratory.

  • Radiological Inspector staff augmentation services in support of Accelerated Transuranic Waste activities at the Savannah River Site.

 

 

 

 

 

 

 

 

 

Project/Program Management

  • Provide Transition Management and Project Management services to support the DOE Moab UMTRA Contract.

  • Project Manager to support Development of CPAC Research Assessment Requirements.

  • Primavera Scheduler to support the ITER diagnostic Residual Gas Analyzer.

  • Project Quality Assurance, Startup Test Engineering and Safety Oversight to the Integrated Waste Treatment Unit (IWTU) at DOE Idaho.

  • Project inspections (welding & electrical), document control, cost, schedule and EVMS support to the Salt Waste Project at DOE SRS.

  • Project Controls, Work Package Planning, Procurement Support for Plateau Remediation Project and Waste Treatment Plant at DOE Hanford.

  • Project Manager/Senior Cost Engineer to support SEB and IPT on major procurements across DOE Complex at EMCBC.

  • Project Manager/Scheduler to support procurement group at DOE HQ.

  • Project Manager/Scheduler to support WVDP and SPRU for management of Federal Baseline and REA support to DOE EM CBC.